Four Critical Elements of an Effective Task

Maximizing labor productivity starts with defining exactly what needs to be delivered.

D. Brown Management Profile Picture
Share

Once you define what needs to be delivered (your scope, contract, specs, and plans) in order to maximize labor productivity, it then needs to be broken down into tasks that can be effectively managed.

Field Productivity: Breaking a Project into Manageable Tasks Sets the Foundation for Productivity (1) A clearly defined element of work that can be completed without interruption if all prerequisites are fully met before starting. (2) Task description aligns with the way a crew would be laid-out in the field. (3) Hours and costs as estimated and as planned are known.  (4) Progress can be quickly and accurately estimated by anyone with reasonable field knowledge during a job walk.

We look at four criteria when it comes to defining what an “Effective Task” looks like:

  1. It is a clearly defined element of work that can be started and completed WITHOUT interruption if all prerequisites are met before starting.  
  2. The task description makes sense to anyone with basic trade knowledge aligning with how crews would actually be laid out in the field. When laying out a journey-level craftsperson in the field, the task would not reasonably be broken into smaller tasks.  
  3. Hours and costs to complete the task as estimated and as planned are known, including what is remaining for field layout and installation after design in virtual construction and fabrication if applicable.
  4. ANYONE with reasonable trade knowledge would be able to QUICKLY assess the quantifiable status of the task during a job walk in terms of percent complete or estimated hours remaining to complete.

Do your job cost reports show effective labor curves? Smooth ramp-up to full production then ramp-down is the most desirable at the task, phase, scope, and project levels. The degree to which this can be achieved has a direct impact on safety, quality, and productivity. 

While breaking the the project down into these tasks, the team must rigorously discuss the most effective sequencing, what could be prefabricated or kitted, what is required to be ready before the project starts, and all the other six pillars of task productivity.

Tasking at the beginning of the project ties into Short-Interval-Scheduling (SIP), tracking those via Percent Planned Complete (PPC), and using them daily with ABC Daily Planning.


Learn more in our Labor Productivity Workshop, including how it can be tailored for your company.

All relationships begin with a simple conversation - let's schedule time to talk about how we have helped contractors set up effective "Award-to-Start" systems and develop Foreman Training/Coaching programs. 


Four Critical Elements of an Effective Task
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Related Training
Four Critical Elements of an Effective Task
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Impacted Productivity - Five Elements of Making a Good Case
Contractors are continually faced with costly impacts to their labor productivity and schedule with many beyond their direct control. The best Project Managers know how to identify, communicate, and mitigate these impacts.
Diffusion of Innovations Curve - Leading Change
The contractors that dominate tomorrow’s market will be those that have built strong capabilities for identifying opportunities or problems and then rapidly making lasting changes throughout the organization.
Changes - Impacts Beyond the Direct Costs
Contractors don't typically see the full negative impact of changes and, therefore, don’t put the right level of resources into their management.