Seeing the Mountain - Levels of Detail

You will find a clear path to the top of the mountain faster as you build your ability to situationally vary the resolution you see the world in.

D. Brown Management Profile Picture
Share

This applies to the construction of a project, the building of a contracting business and to life in general.

Leadership Tools: Seeing the Mountain. Top Down or Bottom Up?

Whether you see the “Big Picture” or the “Operational Minutia” matters little.  It is the ability to rapidly zoom in and out as the situation dictates that makes the difference.  

Looking at Mount Everest as an example.  From basecamp one level and radius the mountain is about 428 billion cubic yards of material.  That would require CAT-740’s dumping material at a 1 minute cycle time around the clock for 25,000 years!  

If you built a point cloud at a 1 square foot resolution out of sand it would take 70 cubic yards.  For reference this picture is less than 0.001% of that resolution.  

It is typically better to start developing your mental model as a bigger picture even if it is fuzzy.  You may be trying to climb the wrong mountain and it is much better to see that before starting to fill in the details.




Incentive Compensation for Contractors - Risks
The highest risk with any incentive program is the lack of a well thought out and systematic approach to either administering or implementing the program.
Cash Flow Tip 8 - Subcontractor and Vendor Terms and Pay Schedules
As important as it is for you to have a great Schedule-of-Values (SOV) with your customer, it is equally important to have great terms with your subs and vendors.
Impacted Productivity - Highly variable Labor Scheduling (Level Your Schedule)
The biggest risk for a specialty contractor is the performance of on-site labor. One of the biggest impacts to labor productivity is having a schedule that requires large variations in labor.