Labor productivity IS NOT the biggest problem with project productivity.

D. Brown Management Profile Picture
Share
Field Productivity: Labor Productivity IS NOT The Biggest Problem With Project Productivity

Under similar conditions the variation in how fast two crafts people actually “turn wrenches” is not that big.  For a specialty contractor nearly every process in the company must be focused around these three areas:

  1. Maximize Time-on-Tools (ToT):  Ensure that crafts people spend most of their day working with their tools actually installing things.  Different studies place the industry average between 50-65%.  Leverage the 6 Pillars of Productivity and ABC Daily Planning.  
  2. Minimum Required Installation:  Don’t take critical shortcuts but don’t over-build the project.  In the field we would call it “Gold Plating.” Effective installation details, craft training and good field supervision practices will ensure that you get the right level of quality. 
  3. Minimize Rework:  The only greater waste than installing more than what is required is doing it twice.

General Contractors and Project Owners can do a lot to set the conditions for success with their labor-intensive subcontractors. 


4 Elements of an Effective Task

Site Logistics Management

What is Lean Construction? 

Improving Labor Productivity Workshop




9 Ownership Transition Issues Specific to Contractors
All businesses face challenges with an ownership transition. There are nine interrelated issues that heavily impact contractors.
Problem Finders vs. Problem Solvers
Patty McCord represents the shift that construction contractors must make in how they view HR’s role as it integrates with the company’s strategy and execution.
Incentive Compensation for Contractors - Audience Questions: Edge Cases?
There will always be people in the organization working at the edges of your performance bell curve and that must be addressed with your incentive compensation program.